Beijing raises green building incentive standards

According to the Interim Measures, the maximum reward for a single green building project is 8 million yuan. A prefabricated building can receive 180 yuan of incentive funds per square meter.

Recently, the Beijing Municipal Housing and Urban-Rural Development Commission, in conjunction with the Municipal Planning and Natural Resources Commission and the Municipal Finance Bureau, issued the Interim Measures for the Administration of Municipal Award Funds for Beijing’s Prefabricated Building, Green Building, and Green Ecological Demonstration Zone Projects.

According to the Interim Measures, the maximum reward for a single green building project is 8 million yuan. A prefabricated building can receive 180 yuan of incentive funds per square meter.

The municipal finance has appropriately increased the green building award standards in 2014.

Projects that meet the requirements of the Beijing Green Building Evaluation Standard (DB11 / T825-2015), the National Green Building Retrofit Evaluation Standard (GB / T51141) ), Green Hospital Building Evaluation Standards (GB / T51153) and that have obtained two-star and three-star green building operation labels are awarded with incentive funds of 50 yuan / square meter and 80 yuan / square meter, respectively.

The maximum reward of the project does not exceed 8 million yuan.

The construction unit or the owner unit can log in to the “Beijing Green Building Award Fund Declaration System” of the Beijing Municipal Housing and Urban-Rural Construction Commission ’s online service hall before the end of May every year for online declaration.

Disclaimer: This is an article created by Michael Liang for Chinasdg.org. You can find the original article here: https://chinasdg.org/2020/04/30/beijing-raises-green-building-incentive-standards/.

Leave a Reply

Your email address will not be published. Required fields are marked *